Case Study: Backup Generator
An essential backup power solution was implemented for Spiers & Hartwell Ltd, a major HGV haulage depot. This project involved designing, installing and commissioning a diesel generator to ensure continuous operations and protect temperature-sensitive stock. The result is a seamless, full-site power solution that mitigates frequent outages and eliminates disruption for over 50 staff.
Client
Spiers & Hartwell Ltd
Works undertaken
Design and sizing of back up diesel generating set.
Installing of steel containment systems, internally and externally.
Wiring and connecting of new generator, full commissioning, hand over and demo to client.
Future service contracts put in place.
Type of Site
HGV Haulage Depot
Spec
Generator sized to power warehouse and office of over 50 staff.
Location
Blackminster, Worcestershire.
When
August 2025
Solution required
A reliable backup power solution was essential to protect against frequent outages, minimising business disruption and guaranteeing the constant, correct-temperature storage of stock destined for distribution across the UK and Europe.
Result
The client now has a reliable, site wide backup power solution with a seamless changeover procedure.